Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), 1011-20.

Cheng, E W L and Li, H (2004) Contractor selection using the analytic network process. Construction Management and Economics, 22(10), 1021-32.

Clarke, L and Herrmann, G (2004) Cost vs. production: labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), 1057-66.

Lam, P T I, Kumaraswamy, M M and Ng, S (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), 1067-79.

  • Type: Journal Article
  • Keywords: Contracts; design documentation; specifications; Singapore
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/0144619042000213265
  • Abstract:

    Singapore announced its Construction 21 Blueprint in 1999, which included quality improvement as one of the many initiatives aimed at making the construction industry more competitive and efficient. This has culminated in the development of the National Productivity and Quality Specification (NPQS), which was meant to provide a benchmark of desirable quality standards for construction works in Singapore. A survey was carried out in late 2002 before the launch of the NPQS to investigate the use of specifications in the then Singapore construction industry. A representative cross section of samples was taken to include clients, consultants and contractors in both the public and private sectors. Whilst interestingly different perceptions of the respondents were captured, the survey results show that there is indeed scope for improvement from both the drafting and usage viewpoints. On the drafting side, lack of co-ordination, ambiguities, irrelevant clauses and inappropriate standards were the frequently cited problems. On the usage side, specifications were not used as rigorous as they should be for controlling quality of works on site. Clients, in particular, were concerned with the late approvals of alternative material proposals. These findings point to the need for extra care and attention on the preparation and use of specifications as important project control documents, which always form part of the contracts executed in Singapore.

Lingard, H and Saunders, A (2004) Occupational rehabilitation in the construction industry of Victoria. Construction Management and Economics, 22(10), 1091-101.

Phua, F T T (2004) The antecedents of co-operative behaviour among project team members: an alternative perspective on an old issue. Construction Management and Economics, 22(10), 1033-45.

Shohet, I M and Paciuk, M (2004) Service life prediction of exterior cladding components under standard conditions. Construction Management and Economics, 22(10), 1081-90.

Wang, R-C and Liang, T-F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), 1047-56.